Judges rule nepa study not needed for oil sands project

feature-image

Play all audios:

Loading...

Federal judges today denied environmentalists’ challenge to a 600-mile pipeline carrying oil sands crude from Illinois to Oklahoma. Attorneys from the Sierra Club and National Wildlife


Federation told the court that the government should have conducted more thorough environmental assessments of Enbridge Inc.’s Flanagan South pipeline, but the three-judge appeals panel


today rejected their argument. Central to environmentalists’ case was their contention that the government should have analyzed the entire pipeline under the National Environmental Policy


Act, which requires federal agencies to consider the environmental impacts of their actions. Advertisement "We hold that the federal government was not required to conduct NEPA analysis


of the entirety of the Flanagan South pipeline, including portions not subject to federal control or permitting," wrote Judge Cornelia Pillard, an Obama administration appointee. The


ruling could have broader impacts on environmental reviews for entirely domestic pipelines. However, it isn’t likely to affect cross-border pipelines like the controversial Keystone XL oil


sands project, because the State Department is required to perform comprehensive NEPA analyses for international pipelines, said Sierra Club attorney Douglas Hayes. "We obviously


disagree with the court’s ruling, and we’re still looking at what our next steps are," Hayes said today. Before construction of the Enbridge pipeline, agencies were required to conduct


environmental analyses of regulatory actions — including easements over small swaths of federal land, dredge-and-fill activities at minor water crossings and the pipeline’s impact on


endangered species. Less than 5 percent of the pipeline’s overall length was affected by those regulations. "[T]he agencies were required to conduct NEPA analysis of the foreseeable


direct and indirect effects of those regulatory actions," Pillard wrote. "However, on the facts of this case, the agencies were not obligated also to analyze the impact of the


construction and operation of the entire pipeline." Enbridge’s pipeline crosses nearly 2,000 bodies of water or wetlands, and the Army Corps of Engineers granted it a general nationwide


permit. The Sierra Club argued that the corps erred by analyzing the crossings’ cumulative impacts by region instead of considering the effects of the entire pipeline, but the judges


rejected that claim. "The Corps was authorized to conduct its review on a regional rather than nationwide basis," the opinion says. Judge Janice Rogers Brown, a Republican


appointee, concurred with the majority’s judgment today but said that route was "needlessly circuitous." No "amount of artful pleading" can convert "minor federal


engagements into a ‘connected action’ that subjects the 580 miles of _private_ pipeline to NEPA review," she wrote. Flanagan South is now fully functional and can carry up to 600,000


barrels of crude per day. The vast majority of the pipeline — more than 95 percent — runs on private land. The other parts cross federally owned Army Corps or Bureau of Indian Affairs


property, and there Enbridge was granted federal easements. During oral arguments in April, Brown had questioned how much the government must do, since most of the pipeline lies on private


land (_Greenwire_, April 9). Click here to read the opinion in _Sierra Club v. Army Corps of Engineers_.